IT Risk Assessment Templates

 

BIA, RA, BCP, DRP template Free BIA, BCP DRP templates BIA, BCP, DRP plan Disaster Recovery Plan (DRP) template Business Continuity Program (BCP) template Data Center Recovery template Risk Assessment Template Business Impact Analysis (BIA) template

Information Technology (IT) Risk Assessment, Risk Management and Data Center (technology) Disaster Recovery Template Suite.

 

This is a complete templates suite required by any Information Technology (IT) department to conduct the risk assessment, plan for risk management and take necessary steps for disaster recovery of IT dept. Any organization, large or small, can use this template and adapt to their environment.

These templates can be used by Healthcare organizations, IT departments of different companies, security consulting companies, manufacturing company, servicing companies, financial institutions, educational organizations, law firms, pharmaceuticals & biotechnology companies, telecommunication companies and others.

The complete package has Risk Assessment guidelines, matrix, templates, forms, worksheets, policies, procedures, methodologies, tools, recovery plan, information on free resources and standards. Our risk assessment templates will help you to comply with following regulations and standards like HIPAA, FDA, SOX, FISMA, COOP & COG, FFIEC, Basel II and ISO 17799.

Feel free to request a sample before buying.

List of documents in this Risk Assessment templates package:

Cost: $480
Buy Now

 

Conducting a Risk Assessment Guide

Objectives

The intention of this document is to help the business conduct a Risk Assessment, which identifies current risks and threats to the business and implement measures to eliminate or reduce those potential risks.  This document provides guidance on how to conduct the Risk Assessment, analyze the information that is collected, and implement strategies that will allow the business to manage the risk.  The following documents are available to help the business complete the assessment:

  • Risk Assessment Template
  • Risk Assessment Worksheet
  • Facility RA Findings Report
  • Executive RA Findings Report
  • Examples of Preventative Measures

The Risk Assessment is only part one of an overall Business Assessment.  A Business Assessment is separated into two constituents, Risk Assessment and Business Impact Analysis (BIA).  The Risk Assessment is intended to measure present vulnerabilities to the business’s environment, while the Business Impact Analysis evaluates probable loss that could result during a disaster.  To maximize the Risk Assessment, a Business Impact Analysis should also be completed. 

Table of Contents of Conducting a Risk Assessment

INTRODUCTION           

Compliance      
Scope  

RISK ASSESSMENT    

Objectives of the Risk Assessment        
Risk Assessment Process        
What Should Be Included?         
Steps to Follow 

ASSESSING YOUR RISK

Identifying Risks / Threats          
Probability of Occurrence           
Vulnerability to Risk      
Potential Impact
Preventative Measures in Place  
Insurance Coverage       
Past Experiences

           
ANALYZING THE RESULTS   

Review Interview Notes  
Follow-Up Meetings       
Report the Results
           

FINAL REPORT & PRESENTATION   

Creation of Executive Report      
Presenting the Results  
Next Steps       
Conclusion       

KEYS FOR SUCCESS

Senior Management Support      
Effective Data Gathering Tools    
Key Resources 
Critical Data     
Executive Report           

APPENDIX ITEMS

Appendix A:  Risk Assessment Survey   
Appendix B:  Risk Assessment Worksheet         
Appendix C:  Facility Risk Assessment Report
Appendix D:  Executive Risk Assessment Report
Appendix E:  Examples of Preventative Measures

Risk Assessment Template

OBJECTIVE

Due to HIPAA Security Rule regulations, your organization must implement Contingency Planning Practices to ensure the protection of ePHI (electronic Protected Health Information).  In order to accomplish this undertaking, there are several steps that your organization will be completing to identify critical business functions, processes and applications that process ePHI and to understand the potential impact to the business if a disruptive event occurred. 

One of the first steps of implementing the Contingency Program for your organization is to conduct a Risk Assessment (RA).  This questionnaire will help you to identify the current risks and threats to the business and implement measures to eliminate or reduce those potential risks.   Once the survey is completed, the RA Project team will analyze the data and create prioritized risk reduction (mitigation) strategies to present to senior management. 

Table of Contents of Risk Assessment Template

OBJECTIVE     

GENERAL INFORMATION        

Respondent Information 
Company Information     

PREVIOUS DISRUPTIONS       

Facility Related 
Technology Related       
Weather Related           

NATURAL & MAN-MADE RISKS & THREATS    

Natural Risks / Threats  
Man-Made Risks / Threats         

ENVIRONMENT & FACILITY RISKS      

Environment Risks / Threats      
Facility Risks / Threat    

PREVENTATIVE MEASURES    

Hazardous Materials     
Fire Containment          
Emergency Notification, Evacuations, Alarms & Exits      
Facility Features, Security,  & Access    
HVAC  
Utilities
Data Center (Technologies)

Preventative Measures

The following list contains examples of preventative measures that can be implemented by the company to mitigate the potential risks that currently exist.   Some of these activities may be achievable easily, as to where some may take more time and more resources.

Natural Risks

These risks are usually associated with weather related events:  flooding, high winds, severe storms, tornado, hurricane, fire, high winds, snow storms, and ice storms. 

Risk / Threat

Preventative Measures

Earthquakes

  • Move large and heavy objects to the fall to prevent injury (from falling on people.)
  • Equipment tie-downs are used on all critical computer equipment.
  • Emergency power is available on-site.
  • Earthquake construction guidelines have been adhered to so that damage can be minimized.
  • Critical data and vital records should be backed up and sent offsite for storage.
  • Staff should be trained in Earthquake evacuations and safety.

Man-Made Risks

These risks are usually associated with man-made type of events:  Bomb threats, vandalism, terrorism, civil disorder, sabotage, hazardous waste, work stoppage (internal/external), and computer crime. 

Risk / Threat

Preventative Measures

Staff Productivity Risks
  • Alternate sources of trained employees have been identified
  • Proper training and necessary cross-training is conducted
  • Files are backed up and procedures are documented
  • The work areas are comfortable and safe

Environmental Risks

These risks are usually associated with exposures from surrounding facilities, businesses, government agencies, etc. 

Risk / Threat

Preventative Measures

Hazardous Materials Plant

 

  • There is a nightly backup of data processing electronic record and that backup is stored off-site
  • The off-site backup facility is a sufficient distance away from this facility
  • An alternate site has been identified for use in the event that this facility is unusable

Final Facility Risk Assessment Report Template w/ charts

<Enter Facility Name>
Address of Location:
Participant: Date of Report:

The interview was conducted by <Enter the Name of Person(s) conducting interviews> on <Enter Month, Day, and Year>. 

Overview of Facility Business Operations

The <Name of Facility> is responsible for <enter overview of all business operations that are conducted at this site.  (Identify if the facility provides patient care.)    

Previous Disruption Experiences

  • <Enter any previous disruption experiences and details of incident>
  • <Enter any previous disruption experiences and details of incident>
  • <Enter any previous disruption experiences and details of incident>

Risks & Vulnerabilities

Natural Risks
These risks are usually associated with weather related events:  flooding, high winds, severe storms, tornado, hurricane, fire, high winds, snow storms, and ice storms.  In each RA Survey, the facilities manager was asked to identify potential natural risks and rate the severity of each. 

<Enter Chart using the template on the Natural Risks tab in the Executive Report Charts located in the appendix.>

Summary of Natural Risks

For the location of this facility and historical weather patterns, it has been stated that <Enter top 3 – 5 Natural Risks> pose the biggest threat.  <Add additional comments if necessary.> 

How the risk ranking was determined:  Overall Risk = Probability * Severity (Magnitude – Mitigation)

Threat

Probability

Magnitude

Mitigation

Overall Risk

Drought

 

 

 

 

Earthquake

 

 

 

 

Fire

 

 

 

 

Flood / Flash Flooding

 

 

 

 

Hurricane / Tropical Storm

 

 

 

 

Ice Storms

 

 

 

 

Landslides

 

 

 

 

Severe Thunderstorms

 

 

 

 

Tornado

 

 

 

 

Wildfire

 

 

 

 

Risk Assessment Policy

Objective

The Risk Assessment (RA) Policy document establishes the activities that need to be carried out by each Business Unit, Technology Unit, and Corporate Units (departments) within the organization. 

All departments must utilize this methodology to identify current risks and threats to the business and implement measures to eliminate or reduce those potential risks.    

Table of Contents for Risk Assessment Policy

TERMINOLOGY
ACCOUNTABILITY
COMPLIANCE
REVISION HISTORY
ENDORSEMENT

I.  POLICY OVERVIEW

A. Purpose
B.  Scope
C.  Ownership Roles & Responsibilities
D. Review Process
E. Reporting Process
F. Update Frequency and Annual Review
G. Approval

II. RA REQUIREMENTS

A. RA Completion
B.  Risks and Threats Identification
C.  Probability of Occurrence
D.  Vulnerability to Risk
E.  Potential Impact of Risk
F.  Preventative Measures
G.  Insurance Coverage
H.  Previous Disruptions

III. RA RESULTS

A.  Overall Facility Risk
B.  Communication
C.  Retention of RA Survey

APPENDIX

Appendix A – Risk Assessment Standards

Applications and Data Criticality Analysis Template

Objective

The purpose of the Application & Data Criticality Analysis is to determine the criticality to covered entity of all application based components and the potential losses which may be incurred if these components were not available for a period of time.  This questionnaire is designed to collect the information necessary to support the development of alternative processing strategies, solutions and IS Recovery plans.

The Business Impact Analysis (BIA) should be completed prior to this engagement.  The results of the BIA should be used to assess technology requirements based on the business needs. 

This questionnaire also serves as a compliancy method for meeting the HIPAA Security Rule requirements for Application & Data Criticality Analysis. 

Table of Contents of Applications and Data Criticality Analysis Template

OBJECTIVE                   

RESPONDENT INFORMATION  

APPLICATION INFORMATION 

Application Information
Application Specifications        
Application Users  
Application Service Providers  
Application Vulnerability          
Application Recovery Complexity        
Application Recovery Plan       
Application Recovery History  
Application Standard Operating Procedures     
Application Source Code and Backup Information       
Application Dependencies        
Application Data Reconstruction          

DATABASE INFORMATION 

Database Information   
Database Service Providers
Database Vulnerability 
Database Recovery Complexity           
Database Recovery Information           
Database Recovery History     
Database Standard Operating Procedures        
Database Backup Information  
Database Backup Tape Information     

HARDWARE (SYSTEM) INFORMATION 

Hardware Information  
Hardware Environment Information      
Hardware Service Providers    
Hardware Vulnerability
Hardware Recovery Complexity          
Hardware Recovery Plan         
Hardware Recovery History    
Hardware Backup Information 
Hardware Backup Tape Information    

NETWORK INFORMATION

Network Equipment Requirements       
Network Service Providers      
Network Vulnerability  
Network Recovery Complexity
Network Recovery Plan          
Network Recovery History      
Network Standard Operating Procedures        

Application Recovery Plan

Purpose

This Recovery Plan documents the strategies, personnel, procedures and resources necessary to recover the <Enter Application Name> Application following any type of short or long term disruption.  The following objectives have been established for this plan:

  • Maximize the value of contingency planning by establishing recovery plans that consists of the following phases:
    1. Notification / Activation:  To activate the plan and notify vendors, customers, employees, etc of the recovery activities
    2. Recovery Phase:  To recovery and resume temporary IT operations on alternate hardware (equipment) and possibly at an alternate location
    3. Restoration Phase:  To restore IT systems processing capabilities to normal operations at the primary location or the new location
  • Define the activities, procedures, and essential resources required to perform <Enter Application Name> processing requirements during prolonged periods of disruption to normal operations.
  • Allocate responsibilities to designated personnel and provide guidance for recovering <Enter Application Name> during prolong periods of interruption to normal operations. 
  • Make certain coordination with other <Enter Company Name> staff is conducted. 
  • Ensure coordination with external contacts, like vendors, suppliers, etc. who will participate in the recovery process. 

Table of Contents for Applications Recovery Plan Template

PLAN MAINTENANCE

PLAN EXERCISE          

PLAN LOCATION         

PLAN DISTRIBUTION

PLAN INTRODUCTION

Purpose                 
Applicability          
Scope                   
Assumptions          
Use Of This Plan   

APPLICATION PROFILE

Application Specifications        
Server Requirements    
Database Requirements           
Network Requirements
Input (Feeders) Dependencies on Applications / Systems         
Output (Receivers) Dependencies on Applications / Systems    
Business Processes

PLAN ACTIVATION PROCEDURES       
            Plan Activation Team   

TEAM MEMBERS & RESPONSIBILITIES 

Activate Team Members          
Travel to Alternate Location     

RECOVERY PROCEDURES 

Restore Application Services   
File Verification Tasks 
Application Validation and Synchronization Tasks        
Restoration Procedures
Original or New Site Restoration          
Concurrent Processing 
Plan Deactivation   

APPENDIX

Appendix A:  Employee Contact List   
Appendix B:  Vendor Contact List

Database Recovery Plan Template

Purpose

This Recovery Plan documents the strategies, personnel, procedures and resources necessary to recover the Database following any type of short or long term disruption.  The following objectives have been established for this plan:

  • Maximize the value of contingency planning by establishing recovery plans that consists of the following phases:
    1. Notification / Activation:  To activate the plan and notify vendors, customers, employees, etc of the recovery activities
    2. Recovery Phase:  To recovery and resume temporary IT operations on alternate hardware (equipment) and possibly at an alternate location
    3. Restoration Phase:  To restore IT systems processing capabilities to normal operations at the primary location or the new location
  • Define the activities, procedures, and essential resources required to perform <Enter Database Name> processing requirements during prolonged periods of disruption to normal operations.
  • Allocate responsibilities to designated personnel and provide guidance for recovering <Enter Database Name> during prolong periods of interruption to normal operations. 
  • Make certain coordination with other <Enter Company Name> staff is conducted. 
  • Ensure coordination with external contacts, like vendors, suppliers, etc. who will participate in the recovery process. 

Table of Contents for Database Recovery Plan Template

CONFIDENTIALITY STATEMENT

PLAN MAINTENANCE       

PLAN EXERCISE      

PLAN LOCATION    

PLAN DISTRIBUTION         

PLAN INTRODUCTION    

Purpose           
Applicability    
Scope 
Assumptions    
Use of This Plan          

DATABASE PROFILE  

Database Specifications           
Server Requirements    

PLAN ACTIVATION PROCEDURES       

Plan Activation Team   

TEAM MEMBERS & RESPONSIBILITIES

Activate Team Members          
Travel to Alternate Location     

RECOVERY PROCEDURES    

Restore Database Services      

RESTORATION PROCEDURES 

Original or New Site Restoration          
Concurrent Processing 
Plan Deactivation         

APPENDIX

Appendix A:  Employee Contact List   
Appendix B:  Vendor Contact List

Network Recovery Plan Template

Purpose

This Recovery Plan documents the strategies, personnel, procedures and resources necessary to recover the <Enter Company Name> network following any type of short or long term disruption.  The following objectives have been established for this plan:

  • Maximize the value of contingency planning by establishing recovery plans that consists of the following phases:
    1. Notification / Activation:  To activate the plan and notify vendors, customers, employees, etc of the recovery activities
    2. Recovery Phase:  To recovery and resume temporary IT operations on alternate hardware (equipment) and possibly at an alternate location
    3. Restoration Phase:  To restore IT systems processing capabilities to normal operations at the primary location or the new location
  • Define the activities, procedures, and essential resources required to perform network recovery during prolonged periods of disruption to normal operations.
  • Allocate responsibilities to designated personnel and provide guidance for recovering the network during prolong periods of interruption to normal operations. 
  • Make certain coordination with other <Enter Company Name> staff is conducted. 

Ensure coordination with external contacts, like vendors, suppliers, etc. who will participate in the recovery process. 

Table of Contents of Network Recovery Plan Template

PLAN MAINTENANCE     

PLAN EXERCISE          

PLAN LOCATION         

PLAN DISTRIBUTION

PLAN INTRODUCTION

Purpose                 
Applicability          
Scope                   
Assumptions          
Use of this Plan      

NETWORK PROFILE  

Network Specifications
Network Requirements

PLAN ACTIVATION PROCEDURES       
            Plan Activation Team   

TEAM MEMBERS & RESPONSIBILITIES       

Activate Team Members          
Travel to Alternate Location     

RECOVERY PROCEDURES

Restore Network Services       
Restoration Procedures
Original or New Site Restoration          
Concurrent Processing 
Plan Deactivation   

APPENDIX 

Appendix A:  Employee Contact List   
Appendix B:  Vendor Contact List       
Appendix C:  Network Diagrams

Disaster Recovery Plan Template

This main document contains the non-technical activities that need to be completed in support of Disaster Recovery operations.  The following sections contain contact numbers, contact personnel, activation and notification procedures, overview of recovery teams, vendor contact information and recovery locations. 

The detailed technical recovery procedures for all components are located in the appendix since these recovery plans are modified on a regular basis due to periodic configuration changes of the company’s Technology Environment.  Furthermore, with continual changes to the hardware, network, and operating systems (OS), technical documents such as the detailed individual DR Plans for this environment will be updated on a regular basis to ensure changes in hardware and operating systems are reflected in the technical DR Procedures. 

Table of Contents for Server Recovery Plan

CONFIDENTIALITY STATEMENT

PLAN MAINTENANCE 

PLAN EXERCISE            

PLAN LOCATION          

PLAN DISTRIBUTION   

MEDIA POLICY

EXECUTIVE SUMMARY  

Definition of A Disaster
Disaster Declaration Criteria    

QUICK REFERENCE GUIDE       

SCOPE & OBJECTIVES     

Scope of This Plan       
Objectives of This Plan

RECOVERY STRATEGY  

Recovery Strategy       
Application & System Recovery          
Network Recovery      
Telecommunications Recovery 
Contractual Agreement for Recovery Services  

PLAN ASSUMPTIONS & EXPOSURES 

Planning Assumptions  
Known Exposures       

DISASTER DECLARATION PROCEDURE       

Declaration Authority   

NOTIFICATION PROCEDURES

Notification & Activation Team

RECOVERY TEAMS   

Management Team      
Administrative Team    
Alternate Site Team     
Offsite Storage Team   

CONTACT LISTS

Employee Contact Information 
Department Notifications         
Vendor Notification     
Other Emergency Contact Numbers

ALTERNATE LOCATIONS 

Assembly Site  
Command Center        
Recovery Site Information        

OFFSITE STORAGE LOCATION 

Offsite Storage Information      

PLAN CERTIFICATION    

Plan Certification         

APPENDIX ITEMS 

I.  Application Technical Recovery       
II. Systems Technical Recovery           
III. Network Technical Recovery         
IV. Telecommunications Technical Recovery    
V. Database Technical Recovery         
Appendix A – Employee Notification Procedures         
Appendix B – Notification Log
Appendix C – Event / Disaster Information       
Appendix D – Record Log      
Appendix E – Alternate Site Authorization Form          
Appendix F – Recovery Status Report 
Appendix G – Disaster Recovery Report         
Appendix H – Travel Accommodations Request Form 
Appendix I – Employee Tracking Form
Appendix J – Assessing Potential Business Impact

Server Recovery Plan Template

Purpose

This Recovery Plan documents the strategies, personnel, procedures and resources necessary to recover the <Enter Server Name> Server following any type of short or long term disruption.  The following objectives have been established for this plan:

  • Maximize the value of contingency planning by establishing recovery plans that consists of the following phases:
    1. Notification / Activation:  To activate the plan and notify vendors, customers, employees, etc of the recovery activities
    2. Recovery Phase:  To recovery and resume temporary IT operations on alternate hardware (equipment) and possibly at an alternate location
    3. Restoration Phase:  To restore IT systems processing capabilities to normal operations at the primary location or the new location
  • Define the activities, procedures, and essential resources required to perform <Enter Server Name> processing requirements during prolonged periods of disruption to normal operations.
  • Allocate responsibilities to designated personnel and provide guidance for recovering <Enter Server Name> during prolong periods of interruption to normal operations. 
  • Make certain coordination with other <Enter Company Name> staff is conducted. 
  • Ensure coordination with external contacts, like vendors, suppliers, etc. who will participate in the recovery process. 

Table of Contents for Server Recovery Plan

CONFIDENTIALITY STATEMENT

PLAN MAINTENANCE 

PLAN EXERCISE            

PLAN LOCATION          

PLAN DISTRIBUTION   

PLAN INTRODUCTION

Purpose                 
Applicability          
Scope                   
Assumptions          
Use of this Plan      

SERVER PROFILE 

Server Specifications   
Network Requirements
Applications          

PLAN ACTIVATION PROCEDURES       
            Plan Activation Team   

TEAM MEMBERS & RESPONSIBILITIES       

Activate Team Members          
Travel to Alternate Location     

RECOVERY PROCEDURES 

            Restore Server Services

RESTORATION PROCEDURES

Original or New Site Restoration          
Concurrent Processing 
Plan Deactivation   

APPENDIX  

Appendix A:  Employee Contact List   
Appendix B:  Vendor Contact List

Telecom Recovery Plan Template

Overview:

Telecommunications Recovery Plan documents the strategies, personnel, procedures and resources necessary to recover company’s Telecommunications following any type of short or long term disruption.  The following objectives have been established for this plan:

  • Maximize the value of contingency planning by establishing recovery plans that consists of the following phases:
    1. Notification / Activation:  To activate the plan and notify vendors, customers, employees, etc of the recovery activities
    2. Recovery Phase:  To recovery and resume temporary IT operations on alternate hardware (equipment) and possibly at an alternate location
    3. Restoration Phase:  To restore IT systems processing capabilities to normal operations at the primary location or the new location
  • Define the activities, procedures, and essential resources required to perform network recovery during prolonged periods of disruption to normal operations.
  • Allocate responsibilities to designated personnel and provide guidance for recovering the network during prolong periods of interruption to normal operations. 
  • Make certain coordination with other staff is conducted. 
  • Ensure coordination with external contacts, like vendors, suppliers, etc. who will participate in the recovery process. 

Table of Contents for Telecommunications Recovery Plan Template

CONFIDENTIALITY STATEMENT

PLAN MAINTENANCE       

PLAN EXERCISE      

PLAN LOCATION    

PLAN DISTRIBUTION
           
PLAN INTRODUCTION    

Purpose           
Applicability    
Scope 
Assumptions    
Use of this Plan

TELECOMMUNICATION PROFILE

Telecommunication Specifications        
Telecommunication Requirements         

PLAN ACTIVATION PROCEDURES

Plan Activation Team   

TEAM MEMBERS & RESPONSIBILITIES 

Activate Team Members          
Travel to Alternate Location     

RECOVERY PROCEDURES    

Restore Telecommunication Services    

RESTORATION PROCEDURES

Original or New Site Restoration          
Concurrent Processing 
Plan Deactivation         

APPENDIX 

Appendix A:  Employee Contact List   
Appendix B:  Vendor Contact List

 

To view specific section of this document, please contact us at Sales@training-HIPAA.net or call us at (515) 865-4591.

 

Business Impact Analysis (BIA) Template Packages

Risk Assessment (RA) Template Packages

Data Center Recovery Template Packages

Business Continuity Plan (BCP) & Disaster Recovery Plan (DRP) Template Packages

Complete Business Contingency Plan Templates Suit Including BIA, RA, BCP, DRP, Revision & Testing plans

Testimonials

View license agreement

Free BIA, RA, BCP, DRP Templates

 

 

 
 
HIPAA Online Training | HIPAA Certification Training | HIPAA Privacy and Security Training | HIPAA Templates Suite | HIPAA Compliance Services | HIPAA Security Policies | Enterprise Contingency Plan | HIPAA Privacy Certification | HIPAA Security Certification | HIPAA Training Schedule | Link to Us
Tel: (515) 865-4591 | Fax: (515) 221-2363
Credit Card Processing
Credit Card Processing
Copyright © 2005-2008 www.Training-HIPAA.net. A SUPREMUS GROUP venture Partner Site: SEO Services
'This site is best viewed using Internet Explorer 5.0/higher or Netscape Navigator 7.0/higher at 1024x768 resolution for optimum performance